Napa County Department of Public Works. Federal Aid Project No. BRLS-5921(061)
BID DATE: February 20, 2025, at 11:00 A.M. Working Days: 504, Engineer’s Estimate: $5.9M
Steelhead Constructors JV (Steelhead) will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed at your local builder’s exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don’t hesitate to call our office. In order that we may give your bid maximum consideration, please supply us with an email prior to the bid date describing the scope of your work.
We are requesting quotes from all qualified subcontractors and suppliers, including all certified DVBE/DBE/MBE/WBE/MB subcontractors. We are soliciting quotes for (including but not limited to):
Construction Staking, Install Survey Monument And Reestablish, Progress Schedule (Critical Path Method), Temporary Traffic Control Plan, Traffic Control And Stage Construction, Temporary Fiber Roll, Temporary Silt Fence, Temporary Drainage Inlet Protection, Temporary Gravel Bags, Stormwater Pollution Prevention Plan, Water Sampling And Analysis Day, Water Quality Annual Report, Allowance For Water Quality, Monitoring And Reporting, Jobsite Management, Temporary Creek Diversion Systems, Contractor Supplied Biologist, Invasive Species Control, Remove Guardrail, Remove Roadside Sign, Removal Of Fence, Relocate Gate, Tree Protection Fencing, Tree Protection Mulch, Temporary High Visibility Fence (Esa Fence), Clearing And Grubbing, Tree Removal (Trees 325 & 326), Roadway & Ditch Excavation, Channel Excavation, Structure Excavation (Bridge), Structure Backfill (Bridge), Imported Borrow, Irrigation, Acorn Planting – Collect & Store Acorn, Acorn Planting And Protection, Planting, Browse Protection Cages, Plant & Irrigation Maintenance (90-Day), Hydroseed, Class 2 Aggregate Base, Hot Mix Asphalt (Type A), Asphalt Dike, Remove Asphalt Concrete Pavement, 24″ Cast-In-Drilled-Hole Concrete piling, 24″ Cast-In-Drilled-Hole Concrete Piling (Rock Socket), Furnish Pc/Ps Wide-Flange Concrete, Girders (70′-80′), Structural Concrete, Bridge Footing, Structural Concrete, Bridge, Structural Concrete, Bridge (Polymer Fiber), Erect Pc/Ps Concrete Girders, Joint Seal (Mr=1/2″), Bar Reinforcing Steel (Bridge), Headed Bar Reinforcement, Bridge Removal (Portion), Bioretention Basin, 18″ Steel Pipe Assembly (Excludes Anchors), Rootwad Installation, Soil Burritos, Header Logs, Toe Rock, Willow Cutting, 18″ Rcp Class Iii, 24″ Rcp Class Iii, 4″ Perforated Pvc (Sdr 35), Welded Steel Pipe Casing (Bridge), G5 And Gt3 Inlets With Type 18-9x Grate Per Caltrans Std Plans D73b And D77b, Pipe Riser With Debris Rack Cage Per Caltrans Std Plan D93c, 18″ Concrete Flared End Section Per Caltrans Std Plan D94b, 24″ Concrete Flared End Section Per Caltrans Std Plan D94b, Drainage Outfall Per County Of Napa Std Detail P-11, Overside Drain Per Caltrans Std Plan D87d, Drainage Ditch, Rock Slope Protection (3/8 Ton, Class Vi, Method A), Rock Slope Protection Fabric Class 8, Miscellaneous Metal – AT&T, Miscellaneous Metal (Bridge) -Stormdrain, 4″ Welded Steel Pipe Conduit, AT&T Trench Excavation, AT&T Trench Backfill, 4×4 Precast Manhole, 4” Pvc Conduit, Install Wire Fence, Install Gate Per Napa Std D-11 And Usda Closure Date Detail, Install Roadside Sign, Midwest Guardrail Delineation, Midwest Guardrail System (Steel Post), Midwest Guardrail System End Treatment (Soft Stop), Install Quadguard M10 Tl-3 Crash Cushion, Concrete Barrier (Type 85), Tubular Bicycle Railing, Pavement Delineation (Detail 27b), Pavement Delineation (Detail 21), Pavement Delineation (Markings), Install Electrical Pull Box.
Steelhead will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units.
Steelhead is an Equal Employment Opportunity Employer. We encourage and actively solicit proposals from DVBE, DBE, MBE, WBE, DBE and MB subcontractors and suppliers on all our projects. All qualified DVBE, DBE, MBE, WBE, and MB subcontractors must be registered and certified by the California Department of Transportation. Steelhead is signatory to Operating Engineers, Laborers, Carpenters, and Cement Masons Unions. All subcontractors must possess a current contractor’s license, insurance, and workers’ compensation coverage meeting Steelhead’s requirements and will be required to sign Steelhead’s Subcontract Agreement. Performance and payment bonds up to 100% may be required for the full amount of the subcontract price. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials, or services, establishing delivery schedules, etc., which may be required by the Owner. Please contact our office and advise us if you are interested in this project. When submitting any bid on a public works project, please prominently include, on your quote, your California Contractors License Number and Department of Industrial Relations Number. More information regarding California Contractors License and DIR Numbers can be found at http://www.cslb.ca.gov/ and http://www.dir.ca.gov/Public-Works/PublicWorks.html Sincerely, STEELHEAD CONSTRUCTORS JV Estimating Department 530-226-6400. Please email quotes to estimating@steelheadconstructors.com